MMG Project

MMG Dugald River Recovery Optimization

Advancing zinc recovery through AI-assisted Process Control (AIPC)

MMG

|

Queensland, Australia

|

2025 - 2026

0.55% zinc recovery uplift after 12 months of operation

< 3 months to repay the initial investment

AI-powered digital twin operating in closed-loop control

Top 10 zinc mines globally

Challenges

  • Improve recovery performance at a concentrator already achieving 97%+ recovery rates.
  • Respond more effectively and consistently to changing ore characteristics and operating conditions.
  • Unlock additional recovery, productivity, and profitability gains beyond conventional optimization approaches.
  • Build confidence in AI-enabled decision-making across operational and metallurgical teams.

Solutions

  • Developed and implemented AIPC, an AI-powered digital twin of the flotation process.
  • Combined process modelling, machine learning, and advanced process control within the plant control system.
  • Enable continuous learning from operating data and automatic adjustment of process setpoints in real time.
  • Applied closed loop control to identify metallurgical relationships not visible through traditional control methods.

Highlights

  • Delivered a 0.55% increase in zinc recovery at an operation already achieving more than 97% recovery; demonstrating additional value could still be unlocked from a mature circuit.
  • Achieved a level of autonomous, AI-driven plant control rarely seen in minerals processing through continuous learning, digital twin technology, and closed-loop optimization.
  • Identified subtle metallurgical relationships and optimization opportunities not visible through traditional process control methods, enabling more consistent operational decision-making.

"As an operation, we are focused on identifying and implementing the right technology that can continue to drive safety and performance improvements. [AIPC] is effectively like an always-on assistant that continuously adjusts how the plant runs to get the most zinc out of every tonne of ore processed."

Dr. Tim Akroyd | General Manager, MMG Dugald River

Project Numbers

  • 0.55% increase in zinc recovery after 12 months of operation.
  • Less than 3 months to repay the initial investment following commissioning.
  • 97%+ recovery operation further optimized through AIPC.
  • 1 year of successful operation milestone recognized by MMG.
  • Top 10 zinc operation globally.